What does a
pool cost?

Start with a pool and a size. Then look at what your yard, deck, and finishes add to the project.

New inground pools

Three example budgets.

Each example assumes standard site access, basic concrete decking, and zero upgrades. Your written price follows a property review and final selections.

Vinyl liner
$60k–$80k16 × 32 ft · Polymer wall
Fiberglass
$90k–$110k14 × 30 ft · 30 Class shell
Gunite
$80k–$120k16 × 32 ft · Custom concrete

Examples from the Aquarius estimator, checked November 4, 2026.

Price a different configuration

What changes the price

Beyond the water.

Two pools with similar dimensions can need very different work. These are the questions to ask before comparing a total.

Walk through your yard
The pool and equipment

Ask for the shell or dimensions, depth, entry, surface, pump, filtration, and any heat or controls. Confirm who connects the utilities and starts up the equipment.

Access, excavation, and drainage

A gate, slope, retaining wall, or long route from the street can change how the crew delivers materials and removes soil. Ask who restores the work route afterward.

Coping, decking, and the finished yard

Compare deck area, material, steps, grading, cover, and fence. Identify what the pool builder includes and what another contractor will finish.

Allowances and approvals

Ask which selections still carry allowances, who handles permits or association approvals, and how changes to the written scope are priced.

Have two written proposals?Compare them line by line.Eight topics, from excavation to handover.

Mark what’s included.

For each topic, mark what Proposal A and Proposal B say. Choose Specified when the work is described in writing. Copy your notes before leaving this page.

What do the five statuses mean?
Not reviewed
You have not assessed this entry yet.
Specified
The work is clearly described in the written scope. Read the actual terms and responsibilities with the project team.
Allowance
The proposal identifies an allowance. Clarify what it covers and how selections or quantities affect the final scope.
Excluded
The proposal excludes the work. Clarify who is responsible and how it connects to the project.
Unclear
You need written clarification of the work, assumptions, or responsibilities.

Review the eight topics below to begin your notes.

Pool construction

Are the construction approach, model or dimensions, depths, entry, finish, and selected features described?

Site preparation

What excavation, soil removal, access preparation, protection, and restoration are described?

Equipment & utilities

Which equipment and plumbing, electrical, gas, or other utility connections are listed, and who handles them?

Pool edge & decking

Are coping, deck materials and quantities, drainage details, and transitions to existing areas identified?

Covers & barriers

Which cover and barrier arrangements, related preparation, and approval responsibilities are described?

Approvals & coordination

Who handles plans, applications, inspections, association reviews, and coordination with separate contractors?

Startup & handover

What filling, startup, orientation, care instructions, and completion documents are described?

Allowances & unknowns

Which selections, assumptions, allowances, exclusions, and processes for additional work remain to be clarified?

Differences are counted only when both entries in a topic have been reviewed. The count does not rank either proposal.

Planning questions

Before you decide.

How do I budget for an existing pool?

Start with the condition of the pool and the parts you want to keep. A liner replacement is a different scope from replacing the liner, coping, deck, and equipment together.

Plan a liner replacementChoose other renovation updates
What should I allow for after construction?

Consider water care, electricity, heating if selected, openings, closings, and periodic equipment or surface work. Ask which tasks you plan to handle and which you’ll arrange with a service team.

Explore Aquarius pool care
Can I finish parts of the backyard later?

Bring the full wish list to design. Utility runs, deck elevations, and future equipment access can affect what makes sense to build in a later phase.

Talk with Burton

Price your own project.

Tell us where you’re building and what you want the finished space to include.